INJECTOR DRIVER INSTALLATION

PROCEDURE


  1. INSTALL INJECTOR DRIVER BRACKET


    1. for LHD:


      1. Install the injector driver bracket to the injector driver with the 3 screws.

        Torque:
        2.0 N*m  { 20 kgf*cm, 18 in.*lbf }
    2. for RHD:


      1. Install the 2 injector driver brackets to the injector driver with the 4 screws.

        Torque:
        2.0 N*m  { 20 kgf*cm, 18 in.*lbf }
  2. INSTALL INJECTOR DRIVER ASSEMBLY


    1. for LHD:


      1. Install the injector driver assembly to the body with the 2 bolts.

        Torque:
        8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
      2. Connect the 3 injector driver connectors to the injector driver.

    2. for RHD:


      1. Install the injector driver assembly to the body with the 2 bolts.

        Torque:
        8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
      2. Attach the clamp and connect the wire harness to the injector driver bracket.

      3. Connect the 3 injector driver connectors to the injector driver.