ECM INSTALLATION

PROCEDURE


  1. INSTALL NO. 2 ECM BRACKET


    1. Install the No. 2 ECM bracket with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  2. INSTALL NO. 1 ECM BRACKET


    1. Install the No. 1 ECM bracket with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  3. INSTALL ECM


    1. Install the ECM with the bolt and 2 nuts.

      Torque:
      for bolt
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
      for nut
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    2. for LHD:

      Attach the 2 clamps.

    3. for RHD:

      Attach the 3 clamps.

    4. Connect the 4 connectors.

  4. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY

    Click here

  5. PERFORM REGISTRATION

    Click here