PROCEDURE
INSTALL DIESEL THROTTLE BODY ASSEMBLY
Connect the connector to install the emission control valve wire to the diesel throttle body assembly.
Install a new gasket and the diesel throttle body assembly with the 2 bolts and 2 nuts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
Connect the connector and clamp.
for Cold Area Specification Vehicles:
Connect the No. 11 water by-pass hose and No. 14 water by-pass hose to the diesel throttle body assembly, and slide the 2 clips to secure the hose.
Connect the fuel hose bracket with the bolt to the diesel throttle body assembly.
| 6.5 N*m | 66 kgf*cm | 58 in.*lbf |
INSTALL INTERCOOLER AIR TUBE
Install the intercooler air tube to the diesel throttle body assembly and tighten the hose clamp.
| 6.5 N*m | 66 kgf*cm | 58 in.*lbf |
Connect the connector to the intake air temperature sensor.
INSTALL NO. 4 AIR HOSE
Install the No. 4 air hose to the intercooler air tube and tighten the 2 hose clamps.
| 6.5 N*m | 66 kgf*cm | 58 in.*lbf |
Connect the oil return hose to the intercooler assembly and engine oil level dipstick guide, and slide the 2 clips to secure the hose.
Attach the 4 clamps.
INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Attach the 2 clips and install the No. 1 engine cover sub-assembly to the No. 2 water by-pass pipe.
Install the No. 1 engine cover sub-assembly to the No. 1 engine cover bracket and No. 2 engine cover bracket with the 2 nuts.
| 21 N*m | 214 kgf*cm | 15 ft.*lbf |
PERFORM INITIALIZATION
w/ DPF: