REAR BLOWER CONTROL SWITCH INSPECTION

PROCEDURE


  1. INSPECT HEATER BLOWER SWITCH


    1. B003JPSC01
      *a

      Component with harness connected

      (Heater Blower Switch)

      *b OFF
      *c LO
      *d M1
      *e M2
      *f HI

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Switch Condition Specified Condition
      1 - 3 LO Below 1 Ω

      1 - 3

      1 - 4

      M1 Below 1 Ω

      1 - 3

      1 - 5

      M2 Below 1 Ω

      1 - 3

      1 - 6

      HI Below 1 Ω

      • If the result is not as specified, replace the heater blower switch.