COOLER EXPANSION VALVE INSTALLATION

PROCEDURE


  1. INSTALL COOLER EXPANSION VALVE


    1. Apply sufficient compressor oil to 2 new O-rings and the fitting surfaces of the cooler expansion valve.

      Compressor Oil
      ND-OIL 8 or equivalent
    2. Install the 2 O-rings.

      Note

      Keep the O-rings and O-ring fitting surfaces free of foreign matter.

    3. Temporarily install the cooler expansion valve.

    4. Using a 4 mm hexagon wrench, install the cooler expansion valve with the 2 hexagon bolts.

      Torque:
      3.5 N*m  { 36 kgf*cm, 31 in.*lbf }
  2. CONNECT AIR CONDITIONER TUBE AND ACCESSORY ASSEMBLY


    1. B003SB1

      Remove the vinyl tape from the air conditioner tube and accessory assembly.

    2. Apply sufficient compressor oil to 2 new O-rings and the fitting surfaces of the cooler expansion valve.

      Compressor Oil
      ND-OIL 8 or equivalent
    3. Install the 2 O-rings.

      Note

      Keep the O-rings and O-ring fitting surfaces free of foreign matter.

    4. Connect the air conditioner tube and accessory assembly.

    5. Rotate the hook connector in the direction indicated by the arrow in the illustration and install the bolt.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  3. CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT

    Click here

  4. WARM UP ENGINE

    Click here

  5. INSPECT FOR REFRIGERANT LEAK

    Click here