PROCEDURE
INSTALL BLOWER MOTOR CONTROL
Install the blower motor control with the 2 screws.
Connect the connector.
INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Click here