DESCRIPTION
The main power source for the body ECU is supplied via the door control battery.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
Note
If the body ECU has been replaced, it is necessary to initialize the body ECU.*
As the door control battery is installed between the vehicle battery and body ECU, first perform the inspections to confirm that there are no malfunctions in the power source circuit for the body ECU before performing this troubleshooting procedure.
Inspect the fuses for circuits related to this system before performing the following procedure.
*: w/ Automatic Light Control System
PROCEDURE
CHECK HARNESS AND CONNECTOR (DOOR CONTROL BATTERY - BATTERY AND BODY GROUND)
| *a | Front view of wire harness connector (to Door Control Battery) |
Disconnect the door control battery connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (DOOR CONTROL BATTERY - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)
Disconnect the N49 door control battery connector.
Disconnect the 2J instrument panel junction block assembly connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
Remove the instrument panel junction block assembly.
for LHD: Click here
for RHD: Click here
| *a | Component without harness connected (Instrument Panel Junction Block Assembly) |
- | - |
Remove the body ECU from the instrument panel junction block assembly.
for LHD: Click here
for RHD: Click here
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY for LHD: Click here |
| OK |
|
CHECK DOOR CONTROL BATTERY (POWER OUTPUT)
Turn the ignition switch off.
Remove the ECU-B NO.4 fuse from the engine room relay block.
Leave the vehicle as is for 30 minutes (wait until the door control battery is discharged).
Tech Tips
Discharge time is reduced when the door control battery is not fully charged.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
Install the ECU-B NO.4 fuse to the engine room relay block.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| OK |
|
REPLACE BODY ECU for LHD: Click here |
| NG |
|
REPLACE DOOR CONTROL BATTERY Click here |