GENERATOR INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY

    B003MVJN01

    1. Install the generator assembly with the 2 bolts.

      Torque:
      for bolt A
      62 N*m  { 632 kgf*cm, 46 ft.*lbf }
      for bolt B
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }
    2. Connect the generator connector.

    3. Install the generator wire with the nut to terminal B.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
  2. INSTALL NO. 2 IDLER PULLEY ASSEMBLY


    1. B003MJB

      Install the spacer, No. 2 idle pulley assembly and 2 pulley plates with the bolt.

      Torque:
      45 N*m  { 459 kgf*cm, 33 ft.*lbf }
  3. INSTALL FAN AND GENERATOR V BELT

    Click here

  4. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

    Click here

  5. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

    Click here

  6. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH AIR CLEANER HOSE

    Click here

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here