VALVE BODY ASSEMBLY REMOVAL

CAUTION / NOTICE / HINT

The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the valve body assembly removal/installation are shown below.

Necessary Procedure After Parts Removed/Installed/Replaced
Replacement Part or Procedure Necessary Procedures Effects/Inoperative when not Performed Link

  • Transmission valve body assembly

  • Any of the shift solenoid valves

Reset memory Large shift shock

for 1GD-FTV:

Click here

for 2GD-FTV:

Click here

for 2TR-FE:

Click here

for 1GR-FE:

Click here

PROCEDURE


  1. DISCONNECT TRANSMISSION WIRE

    Click here

  2. REMOVE VALVE BODY OIL STRAINER ASSEMBLY


    1. B003J55

      Remove the 3 bolts and valve body oil strainer assembly from the transmission valve body assembly.

    2. Remove the O-ring from the valve body oil strainer assembly.

  3. REMOVE TRANSMISSION VALVE BODY ASSEMBLY


    1. B003M45

      Remove the bolt, detent spring cover and detent spring from the transmission valve body assembly.

    2. B003JV6

      Remove the 12 bolts and transmission valve body assembly from the automatic transmission case sub-assembly.

  4. REMOVE MANUAL VALVE


    1. B003MTQ

      Remove the manual valve from the transmission valve body assembly.

  5. REMOVE TRANSMISSION CASE GASKET


    1. B003JLW

      Remove the 2 transmission case gaskets from the automatic transmission case sub-assembly.