PROCEDURE
INSTALL VACUUM PUMP BEARING
Using a press, press in a new vacuum pump bearing to the vacuum pump shaft.
INSTALL VACUUM PUMP SHAFT
Using SST and a press, press in the vacuum pump shaft to the vacuum pump housing.
Using snap ring pliers, install a new snap ring.
Note
Make sure that the snap ring is firmly installed to the groove.
INSTALL VACUUM PUMP GEAR
Temporarily install the woodruff key and vacuum pump gear to the vacuum pump assembly with the gear lock nut.
Mount the vacuum pump gear in a vise.
Note
Place aluminum plates on the vise to prevent damage to the vacuum pump gear.
Tighten the gear lock nut.
INSTALL VACUUM PUMP BLADE
| *a | Round End |
Apply engine oil to the vacuum pump rotor, and install the vacuum pump rotor to the vacuum pump housing.
Install 5 new vacuum pump blades with the round ends facing outward.
Tech Tips
Apply engine oil to the blades.
Make sure that the blades are flush with the vacuum pump rotor surface.
INSTALL VACUUM PUMP END COVER
Mount the vacuum pump assembly in a vise.
Note
Place aluminum plates on the vise to prevent damage to the vacuum pump assembly.
Apply engine oil to 2 new O-rings.
Install the 2 O-rings.
Install the vacuum pump end cover and temporarily install the 3 bolts.
Using a 5 mm pin punch and hammer, tap in the 2 straight pins.
Tighten the 3 bolts.
INSTALL CHECK VALVE SUB-ASSEMBLY
Install a new gasket and the check valve sub-assembly.
Install 2 new gaskets and the union with the union bolt.
Tech Tips
Insert the union pin into the hole of the casing.
INSTALL VACUUM PUMP ASSEMBLY
Install 2 new O-rings.
Install the vacuum pump assembly to the engine with the 2 nuts.
Connect the 2 hoses to the vacuum pump assembly with the clip.
INSTALL NO. 1 TIMING BELT COVER (for 1KD-FTV)
INSTALL NO. 1 TIMING BELT COVER (for 2KD-FTV)
INSTALL RADIATOR ASSEMBLY
for 1KD-FTV:
for 2KD-FTV:
CHECK VACUUM PUMP ASSEMBLY
INSTALL NO. 2 ENGINE UNDER COVER
INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY