COMMON RAIL INSTALLATION

CAUTION / NOTICE / HINT

Note


  • When replacing the parts in the following chart (A), replace the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly, No. 3 injection pipe sub-assembly, No. 4 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly with new ones.

    Replaced Parts (A) Pipes Requiring New Replacement

    • Injector assembly (including shuffling the injector assemblies between the cylinders)

    • Common rail assembly

    • Cylinder head sub-assembly


    • No. 1 injection pipe sub-assembly

    • No. 2 injection pipe sub-assembly

    • No. 3 injection pipe sub-assembly

    • No. 4 injection pipe sub-assembly


    • Supply pump assembly

    • Common rail assembly

    • Cylinder block sub-assembly

    • Cylinder head sub-assembly

    • Cylinder head gasket

    • Timing Gear Case Assembly

    Fuel inlet pipe sub-assembly
  • After removing the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly, No. 3 injection pipe sub-assembly, No. 4 injection pipe sub-assembly and fuel inlet pipe sub-assembly, clean them with a brush and compressed air.

  • When replacing the common rail assembly, do not remove the foreign object mixing prevention caps of the common rail assembly until just before the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly, No. 3 injection pipe sub-assembly, No. 4 injection pipe sub-assembly and fuel inlet pipe sub-assembly are connected to the common rail assembly.

PROCEDURE


  1. INSTALL COMMON RAIL ASSEMBLY


    1. Install the common rail assembly to the cylinder head sub-assembly with the 2 bolts.

      Torque:
      38 N*m  { 387 kgf*cm, 28 ft.*lbf }
    2. Connect the connector to the pressure discharge valve.

    3. Connect the connector to the fuel pressure sensor connector.

  2. INSTALL FUEL INLET PIPE SUB-ASSEMBLY

    Click here

  3. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

    Click here

  4. INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY

    Click here

  5. INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY

    Click here

  6. INSTALL NO. 1, NO. 2 AND NO. 3 INJECTION PIPE SUB-ASSEMBLY

    Click here

  7. INSTALL OIL FILTER SUB-ASSEMBLY

    Click here

  8. INSTALL MANIFOLD STAY

    Click here

  9. INSTALL NO. 1 INTAKE PIPE

    Click here

  10. ADD ENGINE OIL

    Click here

  11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  12. BLEED AIR FROM FUEL SYSTEM

    Click here

  13. INSPECT FOR FUEL LEAK

    Click here

  14. INSPECT FOR OIL LEAK

    Click here

  15. INSPECT ENGINE OIL LEVEL

    Click here

  16. INSTALL NO. 2 ENGINE UNDER COVER

    Click here

  17. INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY

    Click here