CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the throttle body with motor assembly removal/installation are shown below.
| Replacement Part or Procedure | Necessary Procedures | Effects/Inoperative when not Performed | Link |
|---|---|---|---|
|
Inspection After Repair | Poor idle, engine start, etc. |
PROCEDURE
DRAIN ENGINE COOLANT (w/ Heater)
REMOVE INTAKE AIR CONNECTOR
w/ Secondary Air Injection System:
Disconnect the connector and detach the wire harness clamp.
Disconnect the vacuum hose from the air pressure sensor and detach the clamp.
Slide the clip and disconnect the No. 2 PCV hose from the cylinder head cover sub-assembly.
Disconnect the vacuum hose.
Slide the clip and disconnect the No. 1 air hose from the intake air connector.
Loosen the 2 hose clamps and remove the 2 bolts and intake air connector.
REMOVE THROTTLE BODY WITH MOTOR ASSEMBLY
Disconnect the throttle body with motor connector.
w/ Heater:
Slide the 2 hose clips and disconnect the No. 1 water by-pass hose and No. 2 water by-pass hose from the throttle body with motor assembly.
Remove the 4 bolts and the throttle body with motor assembly.
Remove the gasket from the intake manifold.