PROCEDURE
INSTALL DIESEL THROTTLE BODY ASSEMBLY
Connect the connector to install the emission control valve wire to the diesel throttle body assembly.
Install a new gasket and the diesel throttle body assembly with the 2 bolts and 2 nuts.
Connect the connector and clamp.
Connect the fuel hose bracket with the bolt to the diesel throttle body assembly.
INSTALL INTERCOOLER AIR TUBE
Install the intercooler air tube to the diesel throttle body assembly and tighten the hose clamp.
Connect the connector to the intake air temperature sensor.
INSTALL NO. 4 AIR HOSE
Install the No. 4 air hose to the intercooler air tube and tighten the 2 hose clamps.
Connect the oil return hose to the intercooler assembly and engine oil level dipstick guide, and slide the 2 clips to secure the hose.
Attach the 4 clamps.
INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Attach the 2 clips and install the No. 1 engine cover sub-assembly to the No. 2 water by-pass pipe.
Install the No. 1 engine cover sub-assembly to the No. 1 engine cover bracket and No. 2 engine cover bracket with the 2 nuts.
PERFORM INITIALIZATION