INITIALIZATION PROCEDURE FOR DIESEL THROTTLE BODY ASSEMBLY, ELECTRIC EGR CONTROL VALVE ASSEMBLY AND TURBOCHARGER NOZZLE VANE CONTROL ACTUATOR
Tech Tips
When the diesel throttle body assembly, electric EGR control valve assembly or turbocharger nozzle vane control actuator is replaced, perform initialization
Turn the ignition switch to ON.
Note
Do not start the engine.
Turn the ignition switch off and wait for 30 seconds or more.
Turn the ignition switch to ON and wait for 10 seconds or more.
CRANK TIME COMPENSATION RESET FUNCTION
This procedure uses the GTS to perform "Crank Time Compensation Reset".
When replacing the timing rotor (engine assembly), perform "Crank Time Compensation Reset".
Tech Tips
If an error occurs during compensation reset, check the vehicle condition, and then perform compensation reset again.
A communication malfunction may occur if there is a problem with the ECM, a wire harness or the connection to the DLC3. If the wire harnesses and the connection to the DLC3 are inspected and found to be normal, the ECM may be malfunctioning.
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Note
Do not start the engine.
Turn the GTS on.
Enter the following menus: Powertrain / Engine and ECT / Utility / Crank Time Compensation Reset.
| Tester Display |
|---|
| Crank Time Compensation Reset |
When the first screen is displayed, check the vehicle condition and push "Next".
When the screen indicating reset completion is displayed, push "Exit".