PROCEDURE
INSPECT PURGE VSV
Inspect the resistance.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the purge VSV.
Check the operation of the purge VSV.
| *a | Port F |
| *b | Port E |
| *c | Does not flow |
| *d | Air |
Check that air does not flow from port F when air is applied to port E.
| *a | Port F |
| *b | Port E |
| *c | Air |
Apply battery voltage to the connector and check the purge VSV operation.
| OK | ||||
|---|---|---|---|---|
|
If the result is not as specified, replace the purge VSV.