ДАТЧИК ДЕТОНАЦИИ УСТАНОВКА

PROCEDURE


  1. INSTALL KNOCK SENSOR

    Tech Tips

    Perform "Inspection After Repairs" after replacing the knock sensor.

    Click here


    1. A01LA5HC01
      *A for Bank 2
      *B for Bank 1
      *a Engine Rear
      *b Top
      *c Engine Front
      *d 0 to 15°

      Install the 2 knock sensors with the 2 bolts as shown in the illustration.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    2. Connect the 2 knock sensor connectors.

  2. INSTALL NO. 1 WATER OUTLET PIPE


    1. for Type A:

      Install the No. 1 water outlet pipe with the 3 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. for Type B:

      Install the No. 1 water outlet pipe with the 2 nuts and bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Attach the 3 wire harness clamps.

  3. INSTALL CYLINDER HEAD SUB-ASSEMBLY RH (for Bank 1)

    Click here