CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed, installed or replaced during the No. 2 spot light assembly removal / installation are shown below.
| Replacement Part or Procedure | Necessary Procedures | Effects/Inoperative when not Performed | Link |
|---|---|---|---|
| Disconnect cable from negative battery terminal | Drive the vehicle until stop and start control is permitted (approximately 15 to 40 minutes) | Stop and start system | |
| Memorize steering angle neutral point | Panoramic view monitor system | ||
| Initialize back door lock | Power door lock control system | ||
| Initialize servo motor | Air conditioning system | ||
| Reset slide door close position | Power slide door system | ||
| Reset back door close position | Power back door system |
Tech Tips
Use the same procedure for RHD and LHD vehicles.
The procedure listed below is for LHD vehicles.
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE
REMOVE ROOF HEADLINING ASSEMBLY
REMOVE NO. 2 SPOT LIGHT ASSEMBLY LH
Remove the duct.
Disconnect the connector.
Remove the screw.
Detach the claw.
Detach the claw and guide and remove the No. 2 spot light assembly LH.