DOOR CONTROL BATTERY(for RHD) INSTALLATION

PROCEDURE


  1. INSTALL DOOR CONTROL BATTERY


    1. B006KUZ

      Engage the guide to install the door control battery.

    2. Install the nut.

    3. Connect the connector.

  2. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY

    Click here

  3. INSTALL COMBINATION SWITCH ASSEMBLY

    Click here

  4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY

    Click here

  5. INSTALL FRONT NO. 2 CONSOLE BOX INSERT (for Integrated Console Box Type)

    Click here

  6. INSTALL NO. 2 BOX BOTTOM MAT (for Integrated Console Box Type)

    Click here

  7. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY (for Integrated Console Box Type)

    Click here

  8. INSTALL AIR CONDITIONING CONTROL ASSEMBLY

    Click here