GENERATOR INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the wire harness clamp bracket with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Type A:


      1. Install the generator assembly with the 2 bolts.

        Torque:
        43 N*m  { 438 kgf*cm, 32 ft.*lbf }
      2. Temporarily install the generator assembly bracket with the 2 bolts.

      3. Fully tighten the 2 bolts.

        Torque:
        20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    3. Type B:


      1. Install the generator assembly bracket to the generator assembly with the bolt.

        Torque:
        20 N*m  { 204 kgf*cm, 15 ft.*lbf }
      2. Install the generator assembly with the 2 bolts.

        Torque:
        43 N*m  { 438 kgf*cm, 32 ft.*lbf }
      3. Install the nut.

        Torque:
        20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    4. Engage the 3 wire harness clamps.

    5. Connect the 2 compressor and magnetic clutch connectors.

    6. Connect the generator assembly connector.

    7. Connect the wire harness to terminal B with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    8. Close the terminal cap.

  2. INSTALL V-RIBBED BELT

    Click here

  3. INSTALL RADIATOR ASSEMBLY

    Click here

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here