PURGE VALVE INSTALLATION

PROCEDURE


  1. INSTALL PURGE VALVE (PURGE VSV)


    1. Install the purge valve (purge VSV) to the intake air surge tank assembly with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. B006N8NC01
      *1 Fuel Vapor Feed Hose
      *2 No. 1 Fuel Vapor Feed Hose
      *a 2 to 7 mm (0.0787 to 0.276 in.)
      *b 180°
      *c Front
      *d Left

      Engage the wire harness clamp to the purge valve (purge VSV).

    3. Connect the purge valve (purge VSV) connector.

    4. Connect the No. 1 fuel vapor feed hose to the purge valve (purge VSV).

    5. Connect the fuel vapor feed hose to the purge valve (purge VSV) and slide the clip to secure it.

      Tech Tips

      Engage the clip within the area shown in the illustration.

  2. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here