PROCEDURE
INSTALL CYLINDER HEAD GASKET
| *a | Lot No. |
|
Front of Engine |
Place a new cylinder head gasket onto the cylinder block sub-assembly with the lot No. stamp facing upward.
Note
Make sure to install the cylinder head gasket RH in the correct direction.
INSTALL CYLINDER HEAD SUB-ASSEMBLY
INSTALL NO. 2 CYLINDER HEAD GASKET
| *a | Lot No. |
|
Front of Engine |
Place a new No. 2 cylinder head gasket onto the cylinder block sub-assembly with the lot No. stamp facing upward.
Note
Make sure to install the cylinder head gasket LH in the correct direction.
INSTALL CYLINDER HEAD LH
INSTALL WATER OUTLET
INSTALL VALVE STEM CAP
INSTALL VALVE LASH ADJUSTER ASSEMBLY
INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY
INSTALL NO. 1 CHAIN VIBRATION DAMPER
INSTALL NO. 2 CHAIN VIBRATION DAMPER
INSTALL NO. 3 CAMSHAFT SUB-ASSEMBLY