PROCEDURE
INSTALL RELAY BLOCK ASSEMBLY
Preparations for inspection
Connect the positive battery terminal to terminal 2 of the fuel lid opener relay and the negative battery terminal to terminal 1.
Measure resistance
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|