CONDENSER(for 3ZR-FAE) REASSEMBLY

PROCEDURE


  1. INSTALL COOLER DRYER


    1. A01HG6AC01
      *1 Modulator

      Using pliers, install a new cooler dryer to the modulator.

    2. A01HJSL

      Apply sufficient compressor oil to the O-rings.

      Compressor Oil
      ND-OIL 8 or equivalent
    3. A01HF5G

      Using a 14 mm hexagon socket wrench, install the cap to the modulator.

      Torque:
      4.0 N*m  { 41 kgf*cm, 35 in.*lbf }
  2. INSTALL NO. 1 COOLER CONDENSER CUSHION


    1. A01HIV9

      Install the 4 No. 1 cooler condenser cushions with cooler condenser assembly.