NETWORK GATEWAY ECU(for LHD) INSTALLATION

PROCEDURE


  1. INSTALL NETWORK GATEWAY ECU


    1. Attach the 2 claws to install the network gateway ECU.

  2. INSTALL ECU INTEGRATION BOX RH

    Click here

  3. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY

    Click here

  4. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here