GENERATOR INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the 2 wire harness brackets with the 2 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Install the generator assembly with the 2 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
    3. Connect the generator conector to the generator assembly.

    4. Install the wire harness to the terminal B with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    5. Install the terminal cap.

    6. Connect the crankshaft position sensor connector and attach the 2 clamps.

  2. INSTALL FRONT NO. 2 EXHAUST PIPE SUB-ASSEMBLY

    Click here

  3. INSTALL FAN AND GENERATOR V BELT

    Click here

  4. INSPECT REAR ENGINE UNDER COVER RH

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here