ENGINE OIL COOLER INSTALLATION

PROCEDURE


  1. INSTALL OIL COOLER ASSEMBLY


    1. Install the wire harness clamp bracket to the oil cooler assembly with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Install a new oil cooler gasket to the stiffening crankcase assembly.

    3. Install the oil cooler assembly to the stiffening crankcase assembly with the 3 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    4. Connect the No. 4 water by-pass hose and No. 5 water by-pass hose to the oil cooler assembly, and slide the 2 clamps to secure the hoses.

  2. INSTALL NO. 8 ENGINE WIRE


    1. Attach the 2 clamps and install the No. 8 engine wire to the oil cooler assembly.

    2. Connect the 2 No. 8 engine wire connectors.

  3. INSTALL COMPRESSOR ASSEMBLY WITH PULLEY

    Click here

  4. ADD ENGINE OIL

    Click here

  5. INSPECT ENGINE OIL LEVEL

    Click here

  6. INSPECT FOR OIL LEAK

    Click here