WASTE GATE VALVE ACTUATOR INSTALLATION

PROCEDURE


  1. INSTALL WASTE GATE VALVE ACTUATOR WITH BRACKET ASSEMBLY

    Note

    After removal and installation of the waste gate valve actuator with bracket assembly, make sure to check the waste gate valve actuator lift amount.


    1. Install the waste gate valve actuator with bracket assembly with the 2 bolts.

      Torque:
      24 N*m  { 245 kgf*cm, 18 ft.*lbf }

      Tech Tips

      If 2 adjustment washers are installed between the waste gate valve actuator with bracket assembly and turbine with valve housing sub-assembly, install the washers to the same positions.

    2. Install a new E-washer to the waste gate valve actuator with bracket assembly link pin.

      Note

      Do not reuse the E-washer.

  2. INSPECT WASTE GATE VALVE ACTUATOR WITH BRACKET ASSEMBLY

    Click here

  3. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

    Click here

  4. INSTALL INTAKE AIR RESONATOR

    Click here

  5. INSTALL COMPRESSOR OUTLET ELBOW

    Click here

  6. INSTALL NO. 5 EXHAUST MANIFOLD HEAT INSULATOR

    Click here

  7. INSTALL NO. 2 AIR CLEANER HOSE

    Click here

  8. INSTALL INTAKE AIR CONNECTOR

    Click here

  9. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE

    Click here

  10. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

    Click here