PROCEDURE
INSTALL PCV VALVE SUB-ASSEMBLY
Apply a light coat of engine oil to the O-ring.
| *a | Torque Wrench Fulcrum Length |
| *b | 22 mm Ball Joint Lock Nut Wrench |
Using a 22 mm ball joint lock nut wrench, install the PCV valve sub-assembly to the cylinder head cover sub-assembly.
| Torque |
|---|
| Specified tightening torque |
| 5.0 N*m (51 kgf*cm, 44 in.*lbf) |
Note
When reusing the PCV valve sub-assembly, inspect the O-ring.
Tech Tips
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
When using a ball joint lock nut wrench (fulcrum length of 149.75 mm (5.90 in.)) + torque wrench (fulcrum length of 185 mm (7.28 in.)): 2.8 N*m (29 kgf*cm, 25 in.*lbf)
Connect the No. 2 PCV hose to the PCV valve sub-assembly, and slide the clip to secure the hose.
INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY