DESCRIPTION
Changing from 1st to 6th is performed by the ECM turning shift solenoid valves SL1, SL2, SL3, SL4 and SL on and off. If an open or short circuit occurs in any of the shift solenoid valves, the ECM controls the remaining normal shift solenoid valves to allow the vehicle to be operated.
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | MIL | Memory | Note |
|---|---|---|---|---|---|---|
| P077513 | Pressure Control Solenoid "B" Circuit Open | An open or short circuit (output signal duty is 0% or 100%) is detected by the ECM in the shift solenoid valve SL2 circuit while driving and shifting gears (SL2 output signal duty is more than 0% and less than 100% under normal conditions) (1-trip detection logic). |
|
Comes on | DTC stored | SAE: P0778 |
MONITOR DESCRIPTION
This DTC indicates an open or short in the shift solenoid valve SL2 circuit. The ECM commands gear shifts by turning the shift solenoid valves on or off. When there is an open or short circuit in any of the shift solenoid valve circuits, the ECM detects the problem, illuminates the MIL and stores a DTC. The ECM also performs the fail-safe function and turns the other normal shift solenoid valves on or off. (In case of an open or short circuit, the ECM stops sending current to the circuit.)
While driving and shifting gears, if the ECM detects an open or short in the shift solenoid valve SL2 circuit, the ECM determines there is a malfunction.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
Note
Perform registration and/or initialization when parts related to the automatic transaxle are replaced.
Tech Tips
The following table shows normal operation of the shift solenoid valve SL2 when the shift lever is in D:
| ECM commanded gear | 1st | 2nd | 3rd | 4th | 5th | 6th |
| Shift solenoid valve SL2 | OFF | OFF | OFF | ON | ON | ON |
PROCEDURE
CHECK HARNESS AND CONNECTOR (SHIFT SOLENOID VALVE SL2 CIRCUIT)
| *a | Front view of wire harness connector (to ECM) |
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| OK |
|
REPLACE ECM Click here |
| NG |
|
CHECK HARNESS AND CONNECTOR (WIRING HARNESS CONNECTOR - ECM)
Disconnect the C21 wiring harness connector.
Disconnect the C20 ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT TRANSMISSION WIRE (SHIFT SOLENOID VALVE SL2)
| *a | Component without harness connected (Transmission Wire) |
Remove the wiring harness connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| OK |
|
REPLACE WIRING HARNESS CONNECTOR Click here |
| NG |
|
INSPECT SHIFT SOLENOID VALVE SL2
| *1 | Shift Solenoid Valve SL2 |
Remove shift solenoid valve SL2.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| OK | ||||
|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| OK |
|
REPLACE TRANSMISSION WIRE Click here |
| NG |
|
REPLACE SHIFT SOLENOID VALVE SL2 Click here |