PROCEDURE
INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
Move the shift lever to N.
Temporarily install the park/neutral position switch assembly to the continuously variable transaxle assembly with the 2 bolts.
Install the lock plate and lock nut to the park/neutral position switch assembly.
| 6.9 N*m | 70 kgf*cm | 61 in.*lbf |
Temporarily install the control shaft lever to the park/neutral position switch assembly.
| *a | P Position |
| *b | N Position |
Turn the control shaft lever clockwise until it stops, then turn it counterclockwise 2 notches.
Remove the control shaft lever from the park/neutral position switch assembly.
| *a | Neutral Basic Line |
| *b | Protrusion |
Align the protrusion with the neutral basic line.
Hold the park/neutral position switch assembly in that position and tighten the 2 bolts.
| 5.4 N*m | 55 kgf*cm | 48 in.*lbf |
Using a screwdriver, bend down the tabs of the lock plate.
Install the control shaft lever to the park/neutral position switch assembly with the washer and nut.
| 12.7 N*m | 130 kgf*cm | 9 ft.*lbf |
Connect the park/neutral position switch assembly connector.
CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Connect the transmission control cable assembly to the control shaft lever with the nut.
| 12 N*m | 122 kgf*cm | 9 ft.*lbf |
Before connecting the transmission control cable assembly, check that the park/neutral position switch assembly and shift lever are in neutral.
Connect the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.
INSPECT SHIFT LEVER POSITION
ADJUST SHIFT LEVER POSITION
INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY
INSTALL BATTERY CARRIER SUPPORT
INSTALL BATTERY CARRIER
INSTALL BATTERY
INSTALL CENTER NO. 1 COWL TOP VENTILATOR LOUVER
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.