INSTRUMENT PANEL SAFETY PAD REASSEMBLY

Click here
Click here

PROCEDURE


  1. Click here

    INSTALL GLOVE COMPARTMENT BRACKET


    1. A01FMI3

      Install the glove compartment bracket with the 2 screws <C>.

  2. Click here

    INSTALL NO. 2 DEFROSTER NOZZLE GARNISH


    1. A01FNP6

      Engage the 6 claws to install the No. 2 defroster nozzle garnish as shown in the illustration.

  3. Click here

    INSTALL NO. 1 DEFROSTER NOZZLE GARNISH


    1. A01FM7C

      Engage the 6 claws to install the No. 1 defroster nozzle garnish as shown in the illustration.

  4. Click here

    INSTALL NO. 2 SIDE DEFROSTER NOZZLE


    1. A01FMVQ

      Engage the 2 claws to install the No. 2 side defroster nozzle.

  5. Click here

    INSTALL NO. 1 SIDE DEFROSTER NOZZLE


    1. A01FMQH

      Engage the 2 claws to install the No. 1 side defroster nozzle.

  6. Click here

    INSTALL INSTRUMENT PANEL PASSENGER AIRBAG ASSEMBLY

    Click here

  7. Click here

    INSTALL NAVIGATION ANTENNA ASSEMBLY (w/ Navigation System)

    Click here

  8. Click here

    INSTALL NO. 2 HEATER TO REGISTER DUCT


    1. A01FN10

      Install the No. 2 heater to register duct with the 2 screws <D>.

  9. Click here

    INSTALL DEFROSTER NOZZLE ASSEMBLY


    1. A01FME0

      Install the defroster nozzle assembly with the 3 screws <D>.

  10. Click here

    INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT


    1. A01FOQA

      Engage the 2 claws.

    2. Install the No. 2 side defroster nozzle duct with the screw <D>.

  11. Click here

    INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT


    1. A01FO6L

      Engage the 2 claws.

    2. Install the No. 1 side defroster nozzle duct with the screw <D>.

  12. Click here

    INSTALL NO. 3 HEATER TO REGISTER DUCT


    1. A01FN0Q

      Install the No. 3 heater to register duct with the 3 screws <D>.

  13. Click here

    INSTALL NO. 1 HEATER TO REGISTER DUCT


    1. A01FOX1

      Install the No. 1 heater to register duct with the 3 screws <D>.

  14. Click here

    INSTALL BRACKET

    Click here

  15. Click here

    INSTALL ROLL RATE AND VERTICAL ACCELERATION SENSOR

    Click here

  16. Click here

    INSTALL NO. 2 INSTRUMENT PANEL WIRE


    1. A01FNMK

      Engage the clamp to install the No. 2 instrument panel wire.

  17. Click here

    INSTALL AUTOMATIC LIGHT CONTROL SENSOR

    Click here