PROCEDURE
INSTALL SEMICONDUCTOR POWER INTEGRATION ECU
Connect the 5 connectors.
Engage the 2 claws to install the semiconductor pwr integration ECU as shown in the illustration.
INSTALL NO. 2 RELAY BLOCK COVER
Engage the 2 claws (B).
Engage the claw (A) to install the No. 2 relay block cover as shown in the illustration.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.