Click here

VALVE BODY ASSEMBLY INSPECTION

Click here
Click here

PROCEDURE


  1. *a Component without harness connected (Shift Solenoid Valve SL1)
    Click here

    INSPECT SHIFT SOLENOID VALVE SL1


    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Connect a positive (+) lead with a 21 W bulb from the battery to terminal 2 and a negative (-) lead to terminal 1 of the shift solenoid valve SL1 connector and check the operation of the valve.

      OK
      The valve moves and makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve SL1.

  2. Click here

    INSPECT SHIFT SOLENOID VALVE SL2

    Tip:

    Use the same procedure as for the shift solenoid valve SL1.

  3. Click here

    INSPECT SHIFT SOLENOID VALVE SL3

    Tip:

    Use the same procedure as for the shift solenoid valve SL1.

  4. Click here

    INSPECT SHIFT SOLENOID VALVE SL4

    Tip:

    Use the same procedure as for the shift solenoid valve SL1.

  5. Click here

    INSPECT SHIFT SOLENOID VALVE SL5

    Tip:

    Use the same procedure as for the shift solenoid valve SL1.

  6. Click here

    INSPECT SHIFT SOLENOID VALVE SLU

    Tip:

    Use the same procedure as for the shift solenoid valve SL1.

  7. Click here

    INSPECT SHIFT SOLENOID VALVE SLT

    Tip:

    Use the same procedure as for the shift solenoid valve SL1.

  8. Click here

    INSPECT SHIFT SOLENOID VALVE SL


    1. A01FNYZC01
      *a

      Component without harness connected

      (Shift Solenoid Valve SL)

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve SL connector terminal - Shift solenoid valve SL body 20°C (68°F) 11 to 15 Ω
    2. Connect a positive (+) lead from the battery to the terminal of the shift solenoid valve SL connector, and a negative (-) lead to the shift solenoid valve SL body, and check the operation of the valve.

      OK
      The valve moves and makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve SL.

  9. Click here

    INSPECT SHIFT SOLENOID VALVE SR


    1. A01FL7QC01
      *a

      Component without harness connected

      (Shift Solenoid Valve SR)

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve SR connector terminal - Shift solenoid valve SR body 20°C (68°F) 11 to 15 Ω
    2. Connect a positive (+) lead from the battery to the terminal of the shift solenoid valve SR connector, and a negative (-) lead to the shift solenoid valve SR body, and check the operation of the valve.

      OK
      The valve moves and makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve SR.