PROCEDURE
INSTALL SCAVENGING PUMP ASSEMBLY
Temporarily install the scavenging pump assembly and a new gasket with the 6 bolts.
Using several steps, uniformly install and tighten the 6 bolts in the order shown in the illustration.
| 23 N*m | 235 kgf*cm | 17 ft.*lbf |
INSTALL NO. 3 OIL PIPE
Install a new O-ring to the No. 3 oil pipe.
Connect the No. 3 oil pipe to the scavenging pump assembly and align the bolt holes.
Do not damage the O-ring.
Do not rotate the No. 3 oil pipe when connecting it to the scavenging pump assembly.
Install the 2 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
INSTALL NO. 2 OIL PIPE
Install a new O-ring and new oil pipe seal to the No. 2 oil pipe.
Connect the No. 2 oil pipe to the scavenging pump assembly and align the bolt holes.
Do not damage the O-ring.
Do not rotate the oil pipe when connecting it to the scavenging pump assembly.
Install the 2 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
INSTALL NO. 1 OIL PIPE
Install a new O-ring and new oil pipe seal to the No. 1 oil pipe.
Connect the No. 1 oil pipe to the scavenging pump assembly and align the bolt holes.
Do not damage the O-ring.
Do not rotate the oil pipe when connecting it to the scavenging pump assembly.
Install the 2 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
INSTALL TIMING CHAIN COVER ASSEMBLY