PROCEDURE
INSTALL NO. 3 V-BANK COVER BRACKET SUB-ASSEMBLY
Install the No. 3 V-bank cover bracket sub-assembly with the bolt.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
INSTALL NO. 4 V-BANK COVER BRACKET SUB-ASSEMBLY
Install the No. 4 V-bank cover bracket sub-assembly with the nut.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
INSTALL IGNITION COIL ASSEMBLY
INSTALL KNOCK CONTROL SENSOR
INSTALL ENGINE COOLANT TEMPERATURE SENSOR
INSTALL ENGINE OIL LEVEL SENSOR
INSTALL ENGINE OIL TEMPERATURE SENSOR
INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY
INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY
Install the No. 2 water by-pass pipe sub-assembly with the 4 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
Connect the No. 2 water by-pass pipe sub-assembly to the oil cooler and heat exchanger assembly and slide the 3 clips to secure it.
INSTALL WATER INLET HOUSING
Install the water inlet housing and a new gasket with the 3 bolts.
| 21 N*m | 214 kgf*cm | 15 ft.*lbf |
Connect the water inlet hose to the water inlet housing and slide the clip to secure it.
INSTALL WATER PUMP PULLEY
INSTALL OIL PUMP DRIVE SHAFT PULLEY
| *a | Hold |
| *b | Turn |
| *c | Protective Tape |
Temporarily install the pulley with the 4 bolts.
Using a screwdriver or an equivalent, hold the pulley and tighten the 4 bolts.
| 21 N*m | 214 kgf*cm | 15 ft.*lbf |
Tape the screwdriver tip before use to avoid damage.
INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
Install the No. 2 idler pulley sub-assembly with the bolt.
| 43 N*m | 438 kgf*cm | 32 ft.*lbf |
INSTALL NO. 4 ENGINE COVER SUB-ASSEMBLY
Install the No. 4 engine cover sub-assembly.
INSTALL NO. 5 ENGINE WIRE
Install the No. 5 engine wire with the 2 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
Connect the 4 knock sensor connectors.
INSTALL FUEL INJECTOR SEAL
INSTALL FUEL INJECTOR ASSEMBLY
INSTALL FUEL DELIVERY PIPE LH
INSTALL FUEL DELIVERY PIPE RH
INSTALL CASE SEPARATOR
Install separator case to the cylinder head with the 4 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
Connect the fuel pressure sensor connector.
INSTALL NO. 4 FUEL PIPE SUB-ASSEMBLY
INSTALL NO. 2 ENGINE COVER SUB-ASSEMBLY LH
SET FUEL PUMP WITH SEAL SUB-ASSEMBLY (for Bank 1)
SET FUEL PUMP WITH SEAL SUB-ASSEMBLY (for Bank 2)
Use the same procedure as for the bank 1 side.
TEMPORARILY INSTALL NO. 2 FUEL PIPE SUB-ASSEMBLY
TEMPORARILY INSTALL NO. 3 FUEL PIPE SUB-ASSEMBLY
INSTALL FUEL PUMP WITH SEAL SUB-ASSEMBLY (for Bank 1)
INSTALL FUEL PUMP WITH SEAL SUB-ASSEMBLY (for Bank 2)
INSTALL NO. 2 FUEL PIPE SUB-ASSEMBLY
INSTALL NO. 3 FUEL PIPE SUB-ASSEMBLY
INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
INSTALL NO. 3 COVER SUB-ASSEMBLY
INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
INSTALL INTAKE AIR SURGE TANK ASSEMBLY
CONNECT NO. 1 FUEL PIPE SUB-ASSEMBLY
INSTALL FUEL INJECTOR ASSEMBLY (for Port Injection)
INSTALL INJECTOR VIBRATION INSULATOR
INSTALL NO. 1 DELIVERY PIPE SPACER
INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY (for Port Injection)
INSTALL NO. 2 FUEL DELIVERY PIPE SUB-ASSEMBLY (for Port Injection)
INSTALL FUEL TUBE SUB-ASSEMBLY
CONNECT VENTILATION HOSE
INSTALL PURGE VALVE (PURGE VSV)
INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
Install the water by-pass pipe sub-assembly to the intake air surge tank assembly with the 2 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
Connect the No. 5 water by-pass hose to the water by-pass pipe sub-assembly and slide the clip to secure it.
Connect the water by-pass hose to the water by-pass pipe sub-assembly and slide the clip to secure it.
Connect the No. 3 water by-pass hose to the water by-pass pipe sub-assembly and slide the clip to secure it.
INSTALL INJECTOR DRIVER BRACKET
INSTALL INJECTOR DRIVER
INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
INSTALL TRANSMISSION BREATHER ASSEMBLY
INSTALL WIRE HARNESS CLAMP BRACKET
| *a | for LH Side |
| *b | for RH Side |
Install the 2 wire harness clamp brackets with the 2 bolts.
| for LH side | ||
| 21 N*m | 214 kgf*cm | 15 ft.*lbf |
| for RH side | ||
| 29 N*m | 296 kgf*cm | 21 ft.*lbf |
INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH
Install the front No. 1 engine mounting bracket LH with the 4 bolts.
| 35 N*m | 357 kgf*cm | 26 ft.*lbf |
INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH
Install the front No. 1 engine mounting bracket RH with the 4 bolts.
| 35 N*m | 357 kgf*cm | 26 ft.*lbf |
INSTALL ENGINE WIRE
Install the engine wire to the engine assembly.
INSTALL NO. 1 ENGINE HANGER
Install the 2 No. 1 engine hangers with the 2 bolts as shown in the illustration.
| Part No. | ||||||
|---|---|---|---|---|---|---|
|
| 43 N*m | 438 kgf*cm | 32 ft.*lbf |
REMOVE ENGINE FROM ENGINE STAND
| *a | No. 1 Engine Hanger |
| *b | Engine Assembly |
| *c | 50° or Less |
Attach an engine sling device and hang the engine assembly with a chain block.
When hanging the engine assembly, make sure to hang the engine assembly with the chain at an angle of 50° or less. Otherwise, the engine assembly or engine hangers may be damaged.
Remove the bolts and engine assembly from the engine stand.