PROCEDURE
INSTALL NO. 2 ECM BRACKET
Install the No. 2 ECM bracket to the ECM with the 2 screws.
| 4.5 N*m | 46 kgf*cm | 40 in.*lbf |
INSTALL NO. 1 ECM BRACKET
Install the No. 1 ECM bracket to the ECM with the 2 screws.
| 4.5 N*m | 46 kgf*cm | 40 in.*lbf |
INSTALL ECM
Install the ECM to the engine room ECU box with the 2 nuts.
| 5.5 N*m | 56 kgf*cm | 49 in.*lbf |
Install the ECM to the engine room ECU box with the name plate facing the outside of the vehicle.
If the ECM has been struck or dropped, replace it.
ENGAGE WIRE HARNESS
Engage the wire harness to the engine room ECU box.
Engage the wire harness clamp.
Connect the transmission control ECU assembly connector.
Engage the wire harness to the engine room ECU box and connect the 6 ECM connectors.
When connecting the connectors, make sure that dirt, water or other foreign matter does not become stuck between the connectors and other part.
Be sure to securely connect the ECM connectors.
Engage the guide and connect the connector holder to the engine room ECU box.
Engage the claw.
Connect the 2 engine wire harness connectors (B).
Connect the engine wire harness connector (A) as shown in the illustration.
INSTALL ENGINE ROOM ECU COVER
Install the engine room ECU cover with the 3 bolts.
| 5.5 N*m | 56 kgf*cm | 49 in.*lbf |
Make sure that the wire harness does not get caught between the parts.
INSTALL COOL AIR INTAKE DUCT SEAL
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
PERFORM INITIALIZATION
w/ Canister Pump Module:
w/o Canister Pump Module: