Click here

THROTTLE BODY INSTALLATION

Click here
Click here

PROCEDURE


  1. Click here

    INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY


    1. B0065GMC01
      *1 No. 4 Water By-pass Hose
      *2 No. 5 Water By-pass Hose
      *a Paint Mark
      *b Down
      *c Forward

      Connect the No. 4 water by-pass hose and No. 5 water by-pass hose to the throttle body with motor assembly and slide the 2 clips to secure them.

      Tip:

      Make sure the direction of the clip is as shown in the illustration.

    2. B0066WV

      Temporarily install a new throttle body gasket and the throttle body with motor assembly to the intake air surge tank assembly with the 2 stud bolts.

      Note:

      If the throttle body with motor assembly has been struck or dropped, replace it.

    3. Using an E6 "TORX" socket wrench, tighten the 2 stud bolts.

      5.0 N*m 51 kgf*cm 44 in.*lbf
    4. Install the throttle body gasket and throttle body with motor assembly with the 2 bolts and 2 nuts.

      10 N*m 102 kgf*cm 7 ft.*lbf
    5. Connect the No. 5 water by-pass hose to the water inlet housing and slide the clip to secure it.

    6. Connect the No. 4 water by-pass hose to the front water by-pass joint and slide the clip to secure it.

    7. Connect the throttle body with motor assembly connector.

  2. Click here

    INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE


    1. Connect the air cleaner cap with air cleaner hose to the throttle body with motor assembly.

    2. B0067HRC01
      *a Protrusion

      Install the air cleaner cap with air cleaner hose with the 2 air cleaner cap clamps.

    3. Tighten the hose clamp.

      4.0 N*m 41 kgf*cm 35 in.*lbf
      Note:

      Fit the protrusion on the air cleaner hose assembly into the hole of the hose clamp on the throttle body with motor assembly side.

    4. Engage the wire harness clamp.

    5. Connect the mass air flow meter sub-assembly connector.

  3. Click here

    CONNECT VENTILATION HOSE


    1. Connect the No. 2 ventilation hose and No. 3 ventilation hose to the air cleaner hose assembly and slide the 2 clips to secure them.

  4. Click here

    ADD ENGINE COOLANT

    Click here

  5. Click here

    INSPECT FOR COOLANT LEAK

    Click here

  6. Click here

    INSTALL CENTER NO. 4 ENGINE UNDER COVER

    Click here

  7. Click here

    INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  8. Click here

    INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here

  9. Click here

    PERFORM INITIALIZATION

    Note:
    • Be sure to perform this procedure after removing and reinstalling the throttle body with motor assembly or any throttle body with motor assembly components.

    • Perform the following procedure after replacing the throttle body with motor assembly or any throttle body with motor assembly components. The following procedure should also be performed if the throttle body with motor assembly is cleaned.


    1. Connect the GTS to the DLC3.

    2. Clear the DTCs.


    3. Turn the engine switch on (IG) without operating the accelerator pedal.

      Note:

      If the accelerator pedal is operated, perform the above steps again.

    4. Perform "Inspection After Repair".


    5. Start the engine and check that the MIL is not illuminated. After the engine is warmed up, check that the idle speed is within the specified range with the A/C switch off.

      Standard
      700 to 800 rpm
      Note:
      • Be sure to perform this step with all accessories off.

      • Make sure that the shift lever is in N or P.

    6. Enter the following menus: Powertrain / Engine / Data List / Throttle Sensor Position.


      1. Powertrain > Engine > Data List
        Tester Display
        Throttle Sensor Position




    7. Fully depress the accelerator pedal and check that the value is 60% or higher.

    8. Perform a road test and confirm that there are no abnormalities.