ELECTRONIC SHIFT LEVER SYSTEM Shift Sensor Circuit

PROCEDURE


  1. CHECK DIAGNOSIS RELATED INFORMATION (HYBRID CONTROL)


    1. Check for diagnosis related information.

      Click here

      Result
      Result Proceed to
      No diagnosis related information is output. A
      The diagnosis related information in the table below is output. B
      Diagnosis Related Information
      P08A662

    A
    B
  2. CHECK DTC OUTPUT (HYBRID CONTROL)


    1. Connect the GTS to the DLC3.

    2. Turn the power switch on (READY).

    3. With the brake pedal depressed, slowly move the shift lever as follows to select each shift position: N → R → N → D → B.

      Tech Tips

      Wait with each state selected for 5 seconds or more.

    4. Push the P position switch (transmission shift main switch) to select park (P).

    5. Enter the following menus: Powertrain / Hybrid Control / Trouble Codes.


      Powertrain > Hybrid Control > Trouble Codes
    6. Check for DTCs.

      Result
      Result Proceed to
      DTCs are not output. A
      DTCs are output. B
    7. Turn the power switch off.


    B
    A
  3. CHECK CONNECTOR CONNECTION CONDITION (HYBRID VEHICLE CONTROL ECU CONNECTOR)


    1. Check the connector connections and contact pressure of the relevant terminals for the hybrid vehicle control ECU connectors.

      Click here

      B004P9FC01
      *A for LHD *B for RHD
      OK
      The connectors are connected securely and there are no contact pressure problems.
      Result
      Proceed to
      OK
      NG

    NG
    OK
  4. CHECK CONNECTOR CONNECTION CONDITION (SHIFT LOCK CONTROL UNIT ASSEMBLY)


    1. Check the connector connections and contact pressure of the relevant terminals for the shift lock control unit assembly connector.

      Click here

      OK
      The connector is connected securely and there are no contact pressure problems.
      Result
      Proceed to
      OK
      NG

    OK
    NG