POWER SWITCH REMOVAL

PROCEDURE


  1. REMOVE CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (for LHD)

    Click here

  2. REMOVE POWER SWITCH (for LHD)


    1. A01VBBC

      Disengage the 2 claws and remove the power switch.

  3. REMOVE INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY (for RHD)

    Click here

  4. REMOVE POWER SWITCH (for RHD)


    1. A01VDD6

      Disengage the 2 claws and remove the power switch.