CAUTION / NOTICE / HINT
Tech Tips
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE
INSTALL NO. 3 MOULDING TAPE
Clean the No. 3 moulding tape installation surface.
When reusing the side mudguard LH, remove the double-sided tape remaining on the No. 3 moulding tape installation surface.
Note
Installing the No. 3 moulding tape with some double-sided tape remaining may cause poor adhesion.
Removing with a screwdriver, etc. may cause damage or poor adhesion.
Clean the No. 3 moulding tape installation surface with a non-residue solvent.
Apply primer to the No. 3 moulding tape installation area on the side mudguard LH.
Note
Do not apply too much primer.
Remove the peeling paper on a new No. 3 moulding tape while making sure not to touch the adhesional surface.
| *1 | Mark-off Line |
| *a | 3.0 mm (0.118 in.) |
| *b | 1.0 mm (0.0394 in.) |
Install a new No. 3 moulding tape in the position shown in the illustration.
Note
Press the double-sided tape on the No. 3 moulding tape firmly to attach.
After the primer dries (3 minutes or more), install the No. 3 moulding tape.
After applying primer, reapply primer after 24 hours elapse.