POWER BACK DOOR MAIN SWITCH INSPECTION

PROCEDURE


  1. INSPECT POWER BACK DOOR MAIN SWITCH


    1. Check the resistance.


      1. A01CMWWC01
        *a

        Component without harness connected

        (Power Back Door Main Switch)

        Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Switch Condition Specified Condition
        16 (L) - 6 (B) Switch off 10 kΩ or higher
        Switch on Below 1 Ω

        If the result is not as specified, replace the power back door main switch.

    2. Inspect the illumination operation.


      1. Apply battery voltage to the power back door main switch connector, and check that the power back door main switch LED illuminates.

        OK
        Measurement Condition Specified Condition

        Battery positive (+) → Terminal 7 (ILL+)

        Battery negative (-) → Terminal 12 (ILL-)

        LED illuminates

        If the result is not as specified, replace the power back door main switch.