CAUTION / NOTICE / HINT
Tech Tips
Use the same procedure for RHD and LHD vehicles.
The procedure listed below is for LHD vehicles.
PROCEDURE
REMOVE NO. 1 HEATER TO REGISTER DUCT SUB-ASSEMBLY
| *1 | Screw <A> or <B> |
Remove the 3 screws <A> or <B> and No. 1 heater to register duct sub-assembly.
REMOVE NO. 2 HEATER TO REGISTER DUCT SUB-ASSEMBLY
| *1 | Screw <A> or <B> |
Remove the 3 screws <A> or <B> and No. 2 heater to register duct sub-assembly.
REMOVE DEFROSTER NOZZLE ASSEMBLY
| *1 | Screw <A> or <B> |
Remove the 3 screws <A> or <B> and defroster nozzle assembly.
REMOVE METER HOOD SET BRACKET
| *1 | Screw <A> or <B> |
Remove the 3 screws <A> or <B> and meter hood set bracket.
REMOVE NO. 2 DEFROSTER NOZZLE GARNISH
Detach the 6 claws and remove the No. 2 defroster nozzle garnish.
REMOVE NO. 1 DEFROSTER NOZZLE GARNISH
Detach the 6 claws and remove the No. 1 defroster nozzle garnish.
REMOVE SIDE DEFROSTER NOZZLE LH
Detach the 4 claws and remove the side defroster nozzle LH.
REMOVE SIDE DEFROSTER NOZZLE RH
Detach the 4 claws and remove the side defroster nozzle RH.
REMOVE NO. 3 INSTRUMENT PANEL CUSHION (w/o Headup Display)
Remove the No. 3 instrument panel cushion.
REMOVE NO. 4 INSTRUMENT PANEL CUSHION
Remove the No. 4 instrument panel cushion.
REMOVE NO. 1 INSTRUMENT PANEL CUSHION
Remove the No. 1 instrument panel cushion.
REMOVE NO. 2 INSTRUMENT PANEL CUSHION
Remove the No. 2 instrument panel cushion.
REMOVE NO. 2 INSTRUMENT PANEL WIRE
REMOVE INSTRUMENT PANEL PASSENGER WITHOUT DOOR AIRBAG ASSEMBLY
REMOVE NAVIGATION ANTENNA ASSEMBLY
REMOVE INSTRUMENT PANEL WIRE
for LHD:
Detach the clamps and remove the instrument panel wire.
for RHD:
Detach the clamps and remove the instrument panel wire.
REMOVE COMBINATION METER MIRROR ECU (w/ Headup Display)
REMOVE INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY (w/ Headup Display)
Detach the 10 clips and 3 guides and remove the instrument cluster finish panel assembly.
REMOVE NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
| *1 | Screw <A> or <B> |
Remove the 3 screws <A> or <B>.
Detach the 2 clips and remove the No. 2 instrument cluster finish panel garnish.
REMOVE INSTRUMENT PANEL FINISH PLATE
Remove the 2 screws and instrument panel finish plate.
REMOVE LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL
Remove the 4 screws and lower No. 2 instrument panel finish panel.