PROCEDURE
INSTALL COOLER EXPANSION VALVE
Apply sufficient compressor oil to 2 new O-rings and the fitting surfaces of the cooler expansion valve.
| Compressor Oil |
|---|
| ND-OIL 11 or equivalent |
Install 2 new O-rings.
Note
Keep the O-rings and O-ring fitting surfaces free of foreign matter.
Temporarily install the cooler expansion valve.
Using a 4 mm hexagon wrench, install the cooler expansion valve with the 2 hexagon bolts.
INSTALL LIQUID PIPE SUB-ASSEMBLY
INSTALL SUCTION PIPE SUB-ASSEMBLY
Remove the vinyl tape from the suction pipe sub-assembly.
Sufficiently apply compressor oil to a new O-ring and the fitting surface of the suction pipe sub-assembly.
| Compressor Oil |
|---|
| ND-OIL 11 or equivalent |
Install the O-ring to the suction pipe sub-assembly.
Note
Keep the O-rings and O-ring fitting surfaces free of foreign matter.
Connect the suction pipe sub-assembly.
Rotate the hook connector in the direction indicated by the arrow in the illustration and install the bolt.
CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT
for HFC-134a(R134a):
for HFO-1234yf(R1234yf):
WARM UP COMPRESSOR
for HFC-134a(R134a):
for HFO-1234yf(R1234yf):
INSPECT FOR REFRIGERANT LEAK
for HFC-134a(R134a):
for HFO-1234yf(R1234yf):