BRAKE HOLD SWITCH INSPECTION

PROCEDURE


  1. INSPECT INTEGRATION CONTROL AND PANEL ASSEMBLY (BRAKE HOLD SWITCH)


    1. A01CR9VC03
      *A for LHD
      *B for RHD
      *a

      Component without harness connected

      (Integration Control and Panel Assembly (Brake Hold Switch))

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      for LHD
      Tester Connection Condition Specified Condition
      8 (SLT1) - 16 (GND1) Switch not pushed 1 MΩ or higher
      Switch pushed Below 2.5 Ω
      for RHD
      Tester Connection Condition Specified Condition
      1 (SLT1) - 9 (GND1) Switch not pushed 1 MΩ or higher
      Switch pushed Below 2.5 Ω

      If the result is not as specified, replace the integration control and panel assembly (brake hold switch).