ECM INSTALLATION

PROCEDURE


  1. INSTALL NO. 2 ECM BRACKET


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  2. INSTALL NO. 1 ECM BRACKET


    1. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  3. INSTALL ECM


    1. B002JMVC02
      B002HVY Bolt A
      B002I10 Bolt B

      Install the ECM with the 3 bolts.

      Torque:
      for bolt A
      6.5 N*m  { 66 kgf*cm, 58 in.*lbf }
      for bolt B
      8.4 N*m  { 86 kgf*cm, 74 in.*lbf }
    2. B002H1T

      Connect the 2 ECM connectors and lock with the 2 levers.

      Note


      • When connecting a connector, make sure that dirt, water and other foreign matter are not stuck between the connector and ECM.

      • Make sure that the 2 levers are securely lowered.

    3. Connect the wire harness to the No. 2 ECM bracket with the bolt.

      Torque:
      8.4 N*m  { 86 kgf*cm, 74 in.*lbf }
  4. INSTALL AIR CLEANER CASE SUB-ASSEMBLY


    1. Install the air cleaner case sub-assembly with the 2 bolts.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  5. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY


    1. Install the air cleaner filter element sub-assembly to the air cleaner case sub-assembly.

  6. INSTALL AIR CLEANER CAP AND HOSE

    Click here

  7. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  8. INSTALL DECK FLOOR BOX LH (w/ Spare Tire)

    Click here

  9. INSTALL REAR DECK FLOOR BOX (w/ Spare Tire)

    Click here

  10. INSTALL NO. 3 DECK BOARD SUB-ASSEMBLY (w/ Spare Tire)

    Click here