DESCRIPTION
The main body ECU (multiplex network body ECU) detects the condition of the parking brake switch assembly.
WIRING DIAGRAM
| *a | Instrument Panel Junction Block Assembly |
| *b | Parking Brake Switch Assembly |
| *c | Main Body ECU (Multiplex Network Body ECU) |
CAUTION / NOTICE / HINT
Note
If the main body ECU (multiplex network body ECU) is replaced, refer to Service Bulletin.*
*: w/ Smart Entry and Start System
As the door control battery is installed between the vehicle battery and main body ECU (multiplex network body ECU), first perform the inspections in On-Vehicle Inspection to confirm that there are no malfunctions in the power source circuit for the main body ECU (multiplex network body ECU) before performing this troubleshooting procedure.*
*: for LHD
PROCEDURE
READ VALUE USING GTS
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Turn the GTS on.
Enter the following menus: Body Electrical / Main Body / Data List.
Read the display on the GTS.
| Tester Display | Measurement Item | Range | Normal Condition | Diagnostic Note |
|---|---|---|---|---|
| Parking Brake SW | Parking brake switch signal | ON or OFF | ON: Parking brake switch on OFF: Parking brake switch off |
- |
| Tester Display |
|---|
| Parking Brake SW |
| OK |
|---|
| Normal conditions listed above are displayed. |
| Result | |||
|---|---|---|---|
|
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here |
| NG |
|
INSPECT PARKING BRAKE SWITCH ASSEMBLY
Remove the parking brake switch assembly.
for LHD: Click here
for RHD: Click here
Inspect the parking brake switch assembly.
for LHD: Click here
for RHD: Click here
| Result | |||
|---|---|---|---|
|
| NG |
|
REPLACE PARKING BRAKE SWITCH ASSEMBLY for LHD: Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (PARKING BRAKE SWITCH ASSEMBLY - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)
Disconnect the 4F instrument panel junction block assembly connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
Remove the instrument panel junction block assembly.
Remove the main body ECU (multiplex network body ECU) from the instrument panel junction block assembly.
Measure the resistance according to the value(s) in the table below.
| *a | Component without harness connected (Instrument Panel Junction Block Assembly) |
- | - |
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| OK |
|
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) Click here |
| NG |
|
REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY Click here |