CAUTION / NOTICE / HINT
PROCEDURE
INSTALL CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)
Engage the 2 claws to install the central gateway ECU (network gateway ECU).
INSTALL ECU INTEGRATION BOX RH (for LHD)
INSTALL ECU INTEGRATION BOX LH (for RHD)
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.