TELEVISION DISPLAY INSTALLATION

PROCEDURE


  1. INSTALL TELEVISION DISPLAY ASSEMBLY


    1. A018HTD

      Engage the 2 clips to temporarily install the television display assembly.

    2. Install the television display assembly with the 4 bolts.

    3. Connect the connector.

  2. INSTALL TELEVISION BASE


    1. Engage the 4 clips to install the television base.