COMBINATION METER INSTALLATION

PROCEDURE


  1. INSTALL COMBINATION METER ASSEMBLY


    1. Connect the 2 connectors.

    2. A0029BR

      Engage the 2 clips as shown in the illustration.

    3. Install the combination meter assembly with the 2 screws.

  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY


    1. A002CCU

      Engage the 2 guides and 9 claws as shown in the illustration.

    2. A0026ZE

      Engage the 2 guides and 4 clips to install the instrument cluster finish panel assembly as shown in the illustration.

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here