FRONT CRANKSHAFT OIL SEAL INSTALLATION

PROCEDURE


  1. INSTALL TIMING CHAIN CASE OIL SEAL


    1. A002CEGC03
      *a Oil Seal Installation Depth

      Apply MP grease to the lip of a new timing chain case oil seal.

    2. Using SST and a hammer, tap in the timing chain case oil seal until its surface is flush with the timing chain cover edge.

      SST
      09223-22010
      09506-35010
      Oil Seal Installation Depth
      0 to 1.0 mm (0 to 0.0394 in.)

      Note


      • Keep the lip free from foreign matter.

      • Do not tap in the timing chain case oil seal at an angle.

  2. INSTALL CRANKSHAFT PULLEY


    1. Install the pulley set key to the crankshaft.

    2. Align the pulley set key with the key groove of the crankshaft pulley.

    3. A002CGIC03
      *a Hold
      B003ZIE Turn

      Using SST, install the crankshaft pulley bolt.

      SST
      09213-70011   ( 09213-70020 )
      09330-00021
      Torque:
      250 N*m  { 2549 kgf*cm, 184 ft.*lbf }
  3. INSTALL V-RIBBED BELT

    Click here